TechLINE Newsletter

4th Quarter 2009

View newsletter in pdf format

A brief description of the topics in this newsletter is provided below.

Tier 4i Engine Speed

The throttle adjustment on Tier 4i engines (P/N 26-00128-XX) used in both 69UG and 69RG model generator units is preset at the engine manufacturer to the proper RPMs, and a TIR (Transport Internationaux Routiers) approved tamper-resistant assembly is used to prevent the throttle from being adjusted.

Troubleshooting P6-6 for EliteLINE® Units

This is a procedure to determine which valve is faulty when running a Pre-Trip test P6-6 on an EliteLINE® model unit. Prior to troubleshooting, check to ensure that the software and configuration numbers are current and correct, and then re-run the test

TechLINE Historical Reference

The following is a directory of frequently referenced TechLine articles. To access articles, go to: www.carrier.com/container-refrigeration and then click on Literature.

2010 Training Update

Listed are the planned training schools for the first half of 2010. These schools are subject to a minimum requirement of 12 students to avoid cancellation. Please check to ensure the class has met this requirement prior to confirming your travel reservations.

Software Release Update

Listed below are the most current software release versions for operating and working with Carrier Transicold container units. Prior to upgrading units you should seek agreement from the equipment owners.

DataCorder Storage

Often questions arise about the veracity of data recorded and stored in the Carrier MicroLink DataCorder. The following points should be noted.